slide

Scafolding

The scafolding is erected around the building

And so it begins

Vehicles and team arrive

Protecting your property

Floor protection is laid

Steel Arrives

The supporting steel beams arrive

Steel

The steel beams are moved into the loft space

Steel

The steel beams are put into place

steel

..and fixed into position

Materials are delivered

The main materials are delivered to the site

Taking the large timbers into the building

The large timbers are taken into the building through the roof

Suspended floor

We now create the suspended floor

suspended floor

Laser levels are used to get accurate alignment

suspended floor

Apprentices

Apprentices keep the site tidy (we've got to give them a mention)

Electrics and plumbing

The first fix electrics and plumbing are installed

Sound proofing

The loft is sound proofed from the floors below using specialised soundproofing insulation

Sound proofing

The sound proofing in the loft is complete

Flooring

Treated interlocking flooring is laid

Start of week 2

Ridge beams located Roof rafters strengthened Dwarf supporting walls fitted Main walls formed Velux windows fitted Main stairwell and stairs created Specialised insulation installed Plaster boarding completed

Ridge beam located

Work continues

Dwarf supporting walls created, roof strengthened

ceilings

Level ceilings are formed

Velux windows

The window locations are prepared...

Velux windows

... and the windows are installed

Insulation

Very specialised insulation is installed to make your loft conversion warm dry and energy efficient

Insulation

The main insulation finished

Insulation

The loft is now fully insulated

Insulation

The insulation is now prepared for the plater board to go on

Plaster boarding

The platster boarding begins, an art in itself

Plaster boarding

Plaster boarding continues

Plaster boarding

The conversion is now fully plaster boarded

Stairs

Hand built stairs are constructed offsite, custom made for your project

Stairs

The entrance to the loft is prepared ready for the installation of the stairs

Stairs

The stairs installed ready for bannisters to be added

Stairs

The completed staircase

Start of week three

Plastering begins

Plastering

The plastering is completed

Week 4

Carpenters return to complete final trims

Carpentry continues

The carpentry work is now nearly complete

Velux windows

The windows are finished

Velux window installation complete

The velux windows ahown from the outside

En suite bathroom in the loft conversion

The en-suite bathroom is installed

decoration

The loft conversion is finally decorated

final views

Another shot of the completed loft conversion